|
|
|
The scaffold is up (again)
|
|
|
|
A different view into what was once our living room
|
|
|
|
The outside loo demolished and rebuilt with cavity block work
|
|
|
|
Our living room - soon to be the second bedroom taking shape
|
|
|
|
The hallway (honest)
|
|
|
|
The old loading hatch to the loft which will soon become a window
|
|
|
|
|
The view out of the window - treetops!
|
|
|
|
The main bedroom taking shape
|
|
|
|
The second en-suite going in
|
|
|
|
The sunny kitchen - to be
|
|
|
|
The view up the stairs (it will improve)
|
|
|
|
The outside decked area
|
|
|
|
|
Temporary storage space
|
|
|
|
The facade before the windows go in
|
|
|
|
The exterior taking shape
|
|
|
|
Toby, inspecting the works
|
|
|
|
The oil tanks under shelter
|
|
|
|
The outside takes shape, the lawn should be laid in March/April
|
|
|
|
|
Sitting pretty and nearly there
|
|
|
|
The living room just needs the builders leftovers removed and a carpet and she is ready
|
|
|
|
The decked area waiting for a final clean up once it stops raining!
|
|
|
|
The hallway leading to the downstairs loo
|
|
|
|
The view from the front door, carpets the only outstanding item
|
|
|
|
The master bedroom, again with builders items waiting to be removed
|
|
|
|
|
The master bedroom from the other direction
|
|
|
|
Detail in the shower
|
|
|
|
The en-suite to the second bedroom
|
|
|
|
Sotlini throughout provided by Pastella
|
|
|
|
The second, double bedroom
|
|
|
|
If you want to, push back the double doors and listen to the wildlife on your doorstep
|
|
|
|
|
The fully fitted kitchen, Neff throughout
|
|
|